Water Supply Line Upgrade
Holcim
Location: Karratha / Dampier
Description: Replace 1.6km of Poly Supply Line from Dampier main to site with new 75mm pipe, with fusion welding of pipework at every 100 metres .
Toilet Block Design & Construct
City of Karratha
Location: Hearsons Cove
Description: Demolish & dispose of old toilet block. Design & construct new.
Gas Supply & Grease Trap
Vicinity Centres
Location: Karratha
Description: Supply and install new 2000L Grease Arrestor and associated plumbing to connect into existing waste services.
Install new sub-main gas supply for tenancy fit out.
Sullage Point with Dump Ezy
City of Karratha
Location: Karratha
Description: Supply & install 3x concrete effluent tanks awith Dump Ezy for dumping station.
Installation of Wash Down Bay
Yara Pilbara
Location: Dampier
Description: Design & construct 21m x 7m wash down bay facility for vehicles, cranes & machinery.
Sewer Main Extension & Upgrade
City of Karratha
Location: Karratha
Description: Supply & install pumps & fibreglass tanks pump station.
• Install new manholes for water access.
• Supply & install rising mains.
• Installation of plumbing & electrical
services into tanks.
• Connection into Water Corp mains.
BWS Stormwater Drainage
Vicinity Centres
Location: Karratha
Description: Cutting of asphalt & connecting to existing storm water drain.
• Grate reinstatement of asphalt.
• Concrete spoon drain.
• Cutting of concrete, installation of PVC pipe & reinstatement of concrete floor & channel grates.
Wash Down Equipment Construction
City of Karratha
Location: Karratha
Description: Decommission existing waste water system.
• Backfill pits with clean fill & remove unnecessary concrete.
• Excavate trenches for new services.
• Install new services (water supply and electrical).
• Supply and compact road base.
• Excavate footing required for new slabs.
• Pour new slabs.
• Supply & install new water treatment apparatus, connect to services and commission for use.
• Shape earthwork around pad and finish off approach ramps and compact.